KELIBRON Guides

Measuring methods

First article inspection and inspection record

3 min readUpdated Course: Part inspection in practice · Lesson 5

Key answer

For first-article inspection, establish the required drawing characteristics, number them, choose suitable instruments and record each measured value and decision. A full first article covers every requirement; routine start-up, changeover or adjustment checks follow the procedure’s scope. Continue production only after acceptance; any concession needs authorized approval.

On this page
  1. How to do it
  2. Filling in the record
  3. When it is needed
  4. Requirements behind it
  5. References
  6. Watch it done
  7. Practise in the lab
  8. Questions
Lab clipMeasure the outside diameter of a flangeOpen in the lab →

How to do it

Confirm which characteristics this inspection must cover under the applicable procedure, then inspect and record them. A full first article covers all requirements; do not silently replace it with a routine key-characteristic check.

  1. Number (balloon) every characteristic on the drawing: sizes, geometric tolerances, notes, surface finish (see inspection characteristics).
  2. Choose an instrument for each one from its tolerance (see choosing instruments) and check that its calibration is valid.
  3. Measure on a part that has cooled to room temperature, and record the instrument used.
  4. Write down the actual value, not just “OK”.
  5. Compare with the limits; any nonconforming characteristic stops the run until the cause is fixed and a new first part conforms.

Release with a nonconforming characteristic only under a concession approved by the authorized person (and the customer where required).

Filling in the record

The caliper readings below are for practising the record, not an instrument-selection recommendation. The capability limits are explained after the example.

Record what each characteristic must meet and which instrument checks it:

No.CharacteristicSpecificationInstrument (ID)
1Ø large stepØ32 ±0.05Digital caliper (CAL-0153)
2Oversize shaft ODØ20 0/−0.05Digital caliper (CAL-0153)

Then record the actual value and the result for the same characteristics:

No.CharacteristicActualResult
1Ø large step32.02OK
2Oversize shaft OD20.07NG (above 20.00)

Row 2 is a deliberately oversize shaft; it is not the stepped shaft failing. Both bands are tighter than a caliper suits: about 10 × its 0.02 mm maximum permissible error, i.e. 0.2 mm (see measurement planning).

Row 1 (0.10 mm, ratio 5) is acceptable only under a relaxed 4:1 ratio; row 2 (0.05 mm, ratio 2.5) needs a micrometer. A digital caliper is shown only to practise recording and the NG decision; the 20.07 reading is 0.07 mm above the upper limit, more than three times the caliper’s 0.02 mm maximum permissible error.

The header carries part number, drawing number and revision, operation, machine, batch or order, date, inspector and the release decision with signature. Keep the record with the batch so the result can be traced.

When it is needed

Typical triggers: a new part or a new drawing revision, a new or changed setup, a tool or fixture change, a new material batch, or a restart after a long stop. Your procedure decides which characteristics are checked each time: a full first article inspection covers all of them; a routine first-off check after a setup often covers the key characteristics in the control plan.

Many Chinese shops combine it with patrol and last-piece checks (首检、巡检、末检) and with self-, mutual and dedicated inspection.

Requirements behind it

ISO 9001:2015 clause 8.6 requires documented evidence that products meet the acceptance criteria, traceable to the person(s) authorizing the release. Aerospace suppliers document first article inspections to AS9102; automotive suppliers report dimensional results in the PPAP submission. Follow the forms your customer requires. These clause numbers are from ISO 9001:2015, which ISO 9001:2026 replaced in September 2026.

In KELIBRON you can practise a small first-article check: the exercises below measure the flange outside diameter with a 75–100 mm outside micrometer and the tip diameter of the 24-tooth gear with a digital caliper, and the lab also has the stepped shaft, the flange bore and the deliberately out-of-tolerance shaft. Write each result with its decision.

References

  1. ISO 9001:2015 — Quality management systems — Requirements (withdrawn; replaced by ISO 9001:2026 on 16 September 2026) · ISO
  2. ISO 9001:2026 — Quality management systems — Requirements (6th edition, 16 September 2026) · ISO
  3. SAE AS9102 — Aerospace First Article Inspection Requirement (cited by number; no public page) · SAE International
  4. AIAG, Production Part Approval Process (PPAP), 4th edition, 2006 (cited by number; no public page) · AIAG

How the guides are checked against these sources: About KELIBRON.

Watch it done

ReenactmentOutside micrometer: outside diameter of flange Ø80 · 0:28Watch in the lab → Follow step by step → Download video (12.9 MB) Video page →

Played back in the lab from domain commands; the reading and any verdict come from the measurement model.

Practise in the lab

Questions

Is first-off inspection the same as first article inspection?

In everyday shop language they are often used for the same thing. Formally, a first article inspection is a complete, documented check of all characteristics, usually for a new part or a change; a first-off check after each setup may cover only the key characteristics.

Why record the actual value instead of OK?

An actual value shows how close the part is to a limit and lets you see a trend; “OK” hides both and cannot be re-checked later.

Try it yourself

Open the same setup in the 3D lab and take the reading yourself.

Open in the lab →

Related guides